Laser Visibility: | Machine Parts |
---|---|
Applicable Material: | Wood/ Bamboo/ Plastic/ Rubber/ Paper |
Cooling System: | Laser Cutting Machine Parts |
Still deciding? Get samples of US$ 10/set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description:
With design patent Certificate, CE and RoHS Certificate;
This Water Chiller has been sold largely to Europe, South America, Asia and other markets;
Economic cooling equipment, easy to install and operate, compact and easily movable.
Features:
• Comprehensive reference to the international radiator - type cooling system;
• Small thermolysis water cooler;
• With completed water flow and over high temperature alarm functions;
• Enclosed water tanks;
• Professional forced air - cooled radiator;
• Equipped with alarm output port.
• Multiple power specifications; CE approval; RoHS approval.
Advantage:
• CW-5200 laser water chiller is suitable for small water cooling device;
• Provide stable working conditions for laser devices;
• Water can be used for a long time;
• High heat dissipating capacity and not easy to be blocked;
• Alarm output port can quickly protect sensitive components.
Benefit:
• Specific disconnection alarm securing protection;
• High cost performance, low failure rate;
• Cool Capacity is 50W / °C;
• Forces circulation, 9L cooling tank capacity;
• It can extend the using life of laser tube and ensure the engraving effect better.
Industrial cooling machine's installation is very simple, the new machine for the first time using, you can install it as following steps.
A.Open the package to check if the machine is intact and all the necessary Accessories are completed.
B.Open the injection port to feed cooling water.
Observing the water level gauge and adding water slowly, be careful not to have the water overflowed! For the cooling of carbon steel equipment, the water should be added an appropriate amount of anti - corrosion agentia. Working in cold north area, it's better to use noncorrosive antifreeze fluid.
C.According to system conditions, please connect the water inlet and outlet pipe well.
D.Plug in power, turn on the power switch. (Do not start up without water in the water tank!)
(1) Power switch turned on, the circulation pump of the chiller starts working. The first time of operating may cause more bubbles in the pipe leading to a flow alarming occasionally, but running for a few minutes later, it will go back to normal.
(2) After the first boot, you must immediately check whether the water pipe leaks.
(3) Power switched on, if the water temperature is below the set figure, it is normal that fans and other components of the machine do not work. The temperature controller will automatically control the working conditions of the compressor, magnetic valve, fans and other parts based on the set controlling parameters.
(4) As it takes a longer time to start the compressor and other components, according to different conditions, the time is range from seconds to minutes, so do not turn off the power and again on frequently.
E.Check the water level in the water tank.
The first startup of the new chiller empties the air in the water pipe, leading a slight water level decline, but in order to keep the water level in the green area, it's allowed to add adequate water again. Please observe and record the current water level, and inspect it again after the chiller running for a period of time, if the water level drops obviously, please re-inspect the water pipeline leakage.
F.Adjust parameters of temperature controller.
CW-5200 series use an intelligent thermostat. Normally users do not need to adjust it. If it is really necessary, please refer to "Operating status and parameters adjustment."